Rigging Inspection Requirements: OSHA & ASME B30 in Plain Language

Rigging inspection programs fail in predictable ways: no designated inspector, no records, and no criteria posted where gear lives. OSHA 1910.184 and the ASME B30 series define what "inspected" actually means — here's the framework in one page.

The Three Inspection Levels

Initial: verify new gear matches the order — markings, tags, certs — before first use. Frequent: visual inspection by the user before each shift or use; no records required, but damaged gear is removed immediately. Periodic: documented inspection by a designated person, at intervals based on service severity — normal service annually at minimum, severe service quarterly or monthly, special service as engineered.

What Gets Inspected, by Standard

Gear Standard Headline criteria
Slings (all types) ASME B30.9 Tags, broken wires, stretch, cuts, hooks
Shackles, hoist rings, links ASME B30.26 Markings, 10% wear, deformation, pins
Hooks ASME B30.10 Throat spread >15%, twist >10°, latch function
Below-hook devices ASME B30.20 Structural, markings, rated load tests

The Automatic Removals

Across all gear: missing or illegible identification, heat and weld damage, cracks anywhere, unauthorized repairs or modifications (welding on rigging hardware is disqualifying), bent load-bearing components, and any doubt — doubt removes gear pending a designated person's evaluation.

Records That Satisfy an Audit

A working file per asset or gear class: unique ID (tag, stamp, or serial), purchase cert, periodic inspection dates and findings, and disposition of removed gear. Destroyed gear should be cut or rendered unusable — a retired sling in a gang box finds its way back to work.

Building the Habit

Designate and train the inspector, stage inspection stations where rigging is stored, color-code periodic inspection status (tape or tag by quarter), and make removal frictionless: if a rigger has to argue to scrap a sling, the program is broken.

Replace Removed Gear Fast

When inspection pulls gear from service, we restock it — slings, shackles, chain, hooks, and hardware with certs, shipped from Texas. List what came out of service in the quote form at the top of the page — quotes answered during business hours.